FAA Checkride Notification
Use the form on this page to notify Leighnor Aircraft that a checkride with the FAA or a DPE has been scheduled.
When a checkride is scheduled, Leighnor Aircraft needs to ensure aircraft logs are available and current to ensure the checkride process with the FAA or DPE goes smoothly.
Leighnor Aircraft also needs to ensure a critical maintenance event will not be falling within the timeframe of the scheduled checkride.
Instructors should use the FAA Checkride activity type in Flight Schedule Pro to schedule checkrides.
Please give Leighnor Aircraft at least 3 days lead time in checkride notifications.